South Locker Room
Reopening the room's original skylight, new wood floor to match the original, wood trim and baseboard, new electrical wiring, paint, and minor improvements.


Here a worker with Floors Inc. installs a new floor using planks salvaged
from another building. Unlike the rest of the second floor, the former bath
and locker rooms only had one layer of wood floor under the 1950s
era vinyl tile. Although plans called to refinish these origional
floors, years of use had damaged them beyond repair.

| < back | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 [ 9 ] 10 | 11 | 12 | 13 | next > |



Aurora Regional Fire Museum • PO Box 1782 • Aurora, IL 60507
Phone: (630) 892-1572 • e-mail:
ARFMinfo@aol.com